February 16, 2022 in News 2022

Norwood Junction Railway Station collision reconstruction 31st December 1968

Post placeholder image

What better way to spend an half-term afternoon whilst recovering from chicken pox than to recreate a non-lethal collision that occurred at Norwood Junction Station on the evening of 31st December 1968. Two trains (each formed of two 4-coach suburban electric units) collided at the up-local platform with the 16:57 from Coulsdon North to London Bridge ploughing into the back of the 16:45 London Bridge to London Bridge (via Streatham and Selhurst) service. 56 passengers suffered minor injuries of which 16 attended hospital. Both drivers (and a guard) also suffered minor injuries. The official report suggested that there was nothing wrong with the signalling and that the accident was due to one of the drivers not paying full attention.

*In our recreation our trains were only made up of 4 carriages each. We discussed the additional safety features that modern trains have to prevent signals being missed and collisions. Elias was very interested in seeing the now defunct platform 7 being in operation with the report map showing trains from Beckenham Junction!




Leave a Reply